{"id":43094,"date":"2023-11-16T17:44:23","date_gmt":"2023-11-16T16:44:23","guid":{"rendered":"https:\/\/panelsandwich.org\/assembly-service-starmodul\/"},"modified":"2026-10-13T12:37:26","modified_gmt":"2026-10-13T10:37:26","slug":"assembly-service-starmodul","status":"publish","type":"page","link":"https:\/\/panelsandwich.org\/en\/assembly-service-starmodul\/","title":{"rendered":"Assembly Sandwich Panels"},"content":{"rendered":"<div class=\"product\"><div class=\"product\">\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"43094\" class=\"elementor elementor-43094 elementor-37399\" data-elementor-post-type=\"page\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2498d095 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"2498d095\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-5112010a\" data-id=\"5112010a\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-8c40bb8 elementor-widget elementor-widget-text-editor\" data-id=\"8c40bb8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"hero-grid\">\n  <div>\n    <p class=\"hero-kicker\">INSTALLATION SERVICE<\/p>\n    <h1>Sandwich panel assembly in Catalonia: roofs and facades<\/h1>\n    <p class=\"hero-lead\"><strong>Sandwich panel assembly<\/strong> service for new construction, refurbishment, roofs and facades. Installation is planned according to the geometry of the work, the type of panel, the supports, the fixings, the finishing touches and the necessary auxiliary means. <\/p>\n    <p class=\"hero-sub\">We assemble in <strong>Catalonia and nearby provinces<\/strong>. Indicative assembly price: <strong>\u20ac18\u201325\/m\u00b2<\/strong> (labor only), depending on surface area, height, and access. In Portugal, we only supply the material.  <\/p>\n    <div class=\"hero-actions\">\n      <a class=\"primary\" href=\"https:\/\/panelsandwich.org\/en\/contact\/\">Request assembly quotation \u2192<\/a>\n      <a class=\"secondary\" href=\"https:\/\/panelsandwich.org\/en\/types-of-sandwich-panels-which-to-choose-based-on-application\/\">View panel types \u2192<\/a>\n    <\/div>\n  <\/div>\n  <div class=\"hero-image\">\n    <img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/elementor\/thumbs\/WhatsApp-Image-2023-11-16-at-09.38.44-qyo5jhtm0n4z7svv4tes44gusqcztvq9gdze350wio.jpeg\" alt=\"Sandwich panel assembly on industrial roof\" title=\"\">\n  <\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-5b60883a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"5b60883a\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-ca8b418\" data-id=\"ca8b418\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-38ce01e2 elementor-widget elementor-widget-heading\" data-id=\"38ce01e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What is checked in a sandwich panel assembly<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6e25b99c elementor-widget elementor-widget-text-editor\" data-id=\"6e25b99c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"max-width:950px;margin:0;\">A good assembly does not consist solely of screwing panels. Watertightness, finish and the behaviour of the envelope also depend on the structure, joints, finishing touches and execution sequence. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-234768be elementor-widget elementor-widget-text-editor\" data-id=\"234768be\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"cards6\">\n  <div class=\"card\"><h3>Work inspection<\/h3><p>Measurements, geometry, height, access, existing support and working conditions.<\/p><\/div>\n  <div class=\"card\"><h3>Material planning<\/h3><p>Type of panel, lengths, fixings, finishing touches, sealing and necessary accessories.<\/p><\/div>\n  <div class=\"card\"><h3>Panel placement<\/h3><p>Alignment, assembly sequence, fixing to the structure and joint treatment.<\/p><\/div>\n  <div class=\"card\"><h3>Flashings and joints<\/h3><p>Ridges, eaves, sides, junctions with walls, openings and singular points.<\/p><\/div>\n  <div class=\"card\"><h3>Skylights and accessories<\/h3><p>Integration of compatible elements when the project requires them.<\/p><\/div>\n  <div class=\"card\"><h3>Final inspection<\/h3><p>Visual check of fixings, joints, finishing touches, cleaning and removal of protective film.<\/p><\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-1868f28a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1868f28a\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2ce6730\" data-id=\"2ce6730\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5051b8b2 elementor-widget elementor-widget-heading\" data-id=\"5051b8b2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Assembly process: from measurement to finish<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4038a3ff elementor-widget elementor-widget-text-editor\" data-id=\"4038a3ff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"max-width:920px;margin:0;\">The sequence is adapted to each project, but these are the usual steps to organize a sandwich panel installation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-763a16cc elementor-widget elementor-widget-text-editor\" data-id=\"763a16cc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"steps\">\n  <div class=\"step\"><span class=\"n\">1<\/span><strong>Initial data<\/strong><p>We receive measurements, photographs, plans, location and type of work.<\/p><\/div>\n  <div class=\"step\"><span class=\"n\">2<\/span><strong>Technical review<\/strong><p>The type of panel, geometry, supports and main junctions are checked.<\/p><\/div>\n  <div class=\"step\"><span class=\"n\">3<\/span><strong>Quotation<\/strong><p>The scope of assembly, finishing touches, access and necessary auxiliary means are assessed.<\/p><\/div>\n  <div class=\"step\"><span class=\"n\">4<\/span><strong>Preparation<\/strong><p>Material, transport, unloading and placement sequence are coordinated.<\/p><\/div>\n  <div class=\"step\"><span class=\"n\">5<\/span><strong>Installation<\/strong><p>Panels, fixings, joints, finishing touches and planned elements are placed.<\/p><\/div>\n  <div class=\"step\"><span class=\"n\">6<\/span><strong>Verification<\/strong><p>Alignment, fixings, junctions, finishing touches and general finish are checked.<\/p><\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-1784ee0 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1784ee0\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-298346ca\" data-id=\"298346ca\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5188789 elementor-widget elementor-widget-heading\" data-id=\"5188789\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Assembly according to panel type and application<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d563f2a elementor-widget elementor-widget-text-editor\" data-id=\"4d563f2a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"max-width:930px;margin:0;\">The assembly technique changes depending on whether it is a roof, a facade or a cold store. Finishing touches, fixings and critical watertightness points also change. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-693bb51c elementor-widget elementor-widget-text-editor\" data-id=\"693bb51c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"type-grid\">\n  <div class=\"type-card\"><h3>Roof assembly<\/h3><p>Panels placed following the slope and support modulation. It is especially important to resolve fixings, overlaps, ridges, eaves and junctions. <\/p><a href=\"https:\/\/panelsandwich.org\/en\/categoria-producto\/sandwich-panel-for-roofing\/\">View related panels \u2192<\/a><\/div>\n  <div class=\"type-card\"><h3>Facade assembly<\/h3><p>Vertical or horizontal placement according to system and project, controlling plumb, modulation, joints, openings and perimeter finishing touches.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/categoria-producto\/sandwich-panel-facade\/\">View related panels \u2192<\/a><\/div>\n  <div class=\"type-card\"><h3>Cold store assembly<\/h3><p>Requires special attention to thermal continuity, joints, sealing, junctions and compatibility between panels and accessories.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/categoria-producto\/cold-room-sandwich-panel\/\">View related panels \u2192<\/a><\/div>\n  <div class=\"type-card\"><h3>Residential assembly<\/h3><p>Applications in dwellings, porches and roofs with higher visual finish and finishing touch requirements.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/categoria-producto\/tile-sandwich-panel\/\">View related panels \u2192<\/a><\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-330abcea elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"330abcea\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6dd7aea2\" data-id=\"6dd7aea2\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3ec898d3 elementor-widget elementor-widget-heading\" data-id=\"3ec898d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What influences the assembly price<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5bc4e742 elementor-widget elementor-widget-text-editor\" data-id=\"5bc4e742\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"max-width:980px;margin:0 0 14px 0;\"><strong>As a guide, sandwich panel assembly costs between \u20ac18 and \u20ac25\/m\u00b2<\/strong>, labor only and excluding material. The final price depends on the project: a 1,000 m\u00b2 open-plan warehouse is not the same as a house roof with dormers. <\/p><p style=\"max-width:980px;margin:0;\">To prepare a useful valuation, we need, at a minimum, the surface area, geometry, height, access, panel type, flashings, and location. You can find more detail in the <a href=\"https:\/\/panelsandwich.org\/en\/how-much-does-sandwich-panel-installation-cost\/\">sandwich panel installation price per m\u00b2<\/a> guide. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5ca795d8 elementor-widget elementor-widget-text-editor\" data-id=\"5ca795d8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"table-wrap\">\n<table>\n<thead><tr><th>Factor<\/th><th>How it affects assembly<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Total surface area<\/td><td>Determines volume of work and approximate number of panels, fixings and finishing touches.<\/td><\/tr>\n<tr><td>Geometry<\/td><td>Roofs with changes of plane, openings, junctions or complex perimeters require more operations.<\/td><\/tr>\n<tr><td>Height and access<\/td><td>Determine platforms, cranes, material lifting and safety organization.<\/td><\/tr>\n<tr><td>Panel type and length<\/td><td>Influences handling, unloading, lifting and placement sequence.<\/td><\/tr>\n<tr><td>Structure condition<\/td><td>Supports must be prepared, aligned and compatible with the fixing system.<\/td><\/tr>\n<tr><td>Finishing touches<\/td><td>Ridges, eaves, sides, gutters, openings and junctions increase detail work.<\/td><\/tr>\n<tr><td>Work location<\/td><td>Affects travel, logistics and transport coordination.<\/td><\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7399aadf elementor-widget elementor-widget-text-editor\" data-id=\"7399aadf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"margin:22px 0 0;\"><a href=\"https:\/\/panelsandwich.org\/en\/contact\/\" style=\"display:inline-flex;background:#F39200;color:#fff;padding:12px 18px;border-radius:6px;font-weight:800;text-decoration:none;\">Send my work data \u2192<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-73386967 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"73386967\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-360a6daf\" data-id=\"360a6daf\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6a448570 elementor-widget elementor-widget-heading\" data-id=\"6a448570\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Sandwich panel assembly in real works<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3c33a960 elementor-widget elementor-widget-text-editor\" data-id=\"3c33a960\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"max-width:900px;margin:0;\">Examples of applications and photographs already published on PanelSandwich.org.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1bde438f elementor-widget elementor-widget-text-editor\" data-id=\"1bde438f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"photo-grid\">\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-07-at-17.04.30-2.jpeg\" alt=\"Warehouse roof with sandwich panel in Sudanell (Lleida)\" title=\"\"><div class=\"photo-copy\"><h3>Warehouse in Sudanell (Lleida)<\/h3><p>Industrial sandwich panel roof: planning of lengths, lifting, and assembly sequence.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/industrial-building-roof-with-sandwich-panel-in-sudanell\/\">View project \u2192<\/a><\/div><\/div>\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/08\/Abrilll-33.jpg\" alt=\"Sandwich panel roof on a concrete warehouse in Torrefarrera\" title=\"\"><div class=\"photo-copy\"><h3>Warehouse in Torrefarrera (Lleida)<\/h3><p>Sandwich panel roof on a concrete warehouse.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/sandwich-panel-roofing-on-a-concrete-warehouse-in-torrefarrera\/\">View project \u2192<\/a><\/div><\/div>\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/07\/biblioteca-lleida-reforma.jpg\" alt=\"Roof renovation of the Lleida Public Library\" title=\"\"><div class=\"photo-copy\"><h3>Lleida Public Library<\/h3><p>Roof rehabilitation with skylights in a public building.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/roof-renovation-at-the-lleida-public-library\/\">View project \u2192<\/a><\/div><\/div>\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-08-21-at-14.21.34.jpeg\" alt=\"House in Aitona with sandwich panel roof and facade\" title=\"\"><div class=\"photo-copy\"><h3>House in Aitona (Lleida)<\/h3><p>Home with sandwich panel roof and enclosure.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/sandwich-panels-on-the-roof-and-facade-of-a-house-in-aitona\/\">View project \u2192<\/a><\/div><\/div>\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/09\/PHOTO-2023-02-10-14-17-55.jpg\" alt=\"House in Vilafortuny with sandwich panels\" title=\"\"><div class=\"photo-copy\"><h3>House in Vilafortuny (Tarragona)<\/h3><p>Home with sandwich panel: flashings and residential finish.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/house-in-vilafortuny-with-sandwich-panels\/\">View project \u2192<\/a><\/div><\/div>\n  <div class=\"photo-card\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/2026\/08\/Abril-37.jpg\" alt=\"Warehouse in Aspa with StarModul structure and sandwich panel\" title=\"\"><div class=\"photo-copy\"><h3>Warehouse in Aspa (Lleida)<\/h3><p>StarModul steel structure and sandwich panel enclosure.<\/p><a href=\"https:\/\/panelsandwich.org\/en\/warehouse-in-aspa-with-a-starmodul-structure-and-sandwich-panels\/\">View project \u2192<\/a><\/div><\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3c0e116d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3c0e116d\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6781c6f8\" data-id=\"6781c6f8\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4361afa0 elementor-widget elementor-widget-text-editor\" data-id=\"4361afa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"safety-grid\"><div><h2 style=\"margin: 0 0 12px; color: #0d2148; font-size: 34px; line-height: 1.15;\">Safety, access and auxiliary means<\/h2><p>Roof work requires planning access, material lifting, platforms, protections and safety systems appropriate to the work.<\/p><p>When an old roof exists, it is also necessary to check what prior actions are necessary before placing the new panel.<\/p><p><strong>If asbestos-containing materials exist<\/strong>, their removal and management must be carried out by the corresponding authorized procedures and agents. This work must be assessed specifically before starting assembly. <\/p><p><a href=\"https:\/\/panelsandwich.org\/en\/contact\/\">Consult my case \u2192<\/a><\/p><\/div><div class=\"safety-img\"><img decoding=\"async\" src=\"https:\/\/panelsandwich.org\/wp-content\/uploads\/elementor\/thumbs\/lineas-de-vida-qyo5mkqkf3ct9ser55crach8w76b25yl7myopsgg4g.webp\" alt=\"Safety system and lifeline on roof\" title=\"\"><\/div><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-53b424a3 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"53b424a3\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2869cd91\" data-id=\"2869cd91\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-62d51e5a elementor-widget elementor-widget-heading\" data-id=\"62d51e5a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently asked questions about sandwich panel assembly<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61a597d1 elementor-widget elementor-widget-accordion\" data-id=\"61a597d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"accordion.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1631\" class=\"elementor-tab-title\" data-tab=\"1\" role=\"button\" aria-controls=\"elementor-tab-content-1631\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">In which areas do you perform assembly?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1631\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"1\" role=\"region\" aria-labelledby=\"elementor-tab-title-1631\"><p>We assemble in Catalonia and nearby provinces. For projects further away, please contact us. In Portugal, we only supply the material, with shipping to the entire country.  <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1632\" class=\"elementor-tab-title\" data-tab=\"2\" role=\"button\" aria-controls=\"elementor-tab-content-1632\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">How much does it cost to assemble sandwich panel per m\u00b2?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1632\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"2\" role=\"region\" aria-labelledby=\"elementor-tab-title-1632\"><p>As a guide, between \u20ac18 and \u20ac25\/m\u00b2 for assembly only, excluding material. It depends on the surface area, height, access, panel type, and flashings. <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1633\" class=\"elementor-tab-title\" data-tab=\"3\" role=\"button\" aria-controls=\"elementor-tab-content-1633\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">What data do you need to quote an assembly?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1633\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"3\" role=\"region\" aria-labelledby=\"elementor-tab-title-1633\"><p>Approximate surface area, measurements or plans, work location, photographs, height, type of panel and a description of the main finishing touches or junctions. The more information there is, the more precise the initial assessment can be. <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1634\" class=\"elementor-tab-title\" data-tab=\"4\" role=\"button\" aria-controls=\"elementor-tab-content-1634\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">Do you assemble sandwich panel on roof and facade?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1634\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"4\" role=\"region\" aria-labelledby=\"elementor-tab-title-1634\"><p>Yes. Assembly is adapted to the type of panel and the support. Roofs and facades have different sequences, fixings and finishing touches, so they are reviewed separately.  <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1635\" class=\"elementor-tab-title\" data-tab=\"5\" role=\"button\" aria-controls=\"elementor-tab-content-1635\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">Can only the assembly be quoted?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1635\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"5\" role=\"region\" aria-labelledby=\"elementor-tab-title-1635\"><p>The scope can be studied according to the project. It is advisable to indicate whether the material is already purchased or whether joint supply and assembly is requested. <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1636\" class=\"elementor-tab-title\" data-tab=\"6\" role=\"button\" aria-controls=\"elementor-tab-content-1636\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">What structure is needed to place sandwich panel?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1636\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"6\" role=\"region\" aria-labelledby=\"elementor-tab-title-1636\"><p>Supports must be compatible with the panel and with the project loads. The spacing between purlins or supports must not be decided solely by a standard measurement: it must be checked with the corresponding documentation and calculation. <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1637\" class=\"elementor-tab-title\" data-tab=\"7\" role=\"button\" aria-controls=\"elementor-tab-content-1637\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">What finishing touches are part of an installation?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1637\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"7\" role=\"region\" aria-labelledby=\"elementor-tab-title-1637\"><p>It depends on the work. On roofs, ridges, eaves, sides and junctions are usual; on facades, corners, crowns, plinths and openings. The quotation must define which finishing touches are included.  <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1638\" class=\"elementor-tab-title\" data-tab=\"8\" role=\"button\" aria-controls=\"elementor-tab-content-1638\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-closed Array\"><\/i>\n\t\t\t\t\t\t\t\t<i class=\"elementor-accordion-icon-opened \"><\/i>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">How long does assembly take?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1638\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"8\" role=\"region\" aria-labelledby=\"elementor-tab-title-1638\"><p>It depends on surface area, geometry, height, access, panel length, lifting means and quantity of finishing touches. That is why it is preferable to calculate the timeframe after reviewing the work. <\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-681db0bb elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"681db0bb\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-77d03ece\" data-id=\"77d03ece\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-68cf6949 elementor-widget elementor-widget-text-editor\" data-id=\"68cf6949\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"cta\">\n  <div>\n    <h2>Request quotation for the assembly of your work<\/h2>\n    <p>Send us measurements, location, photographs or plans and tell us if you need only assembly or complete supply with panels and finishing touches.<\/p>\n  <\/div>\n  <div class=\"cta-actions\">\n    <a class=\"cta-primary\" href=\"https:\/\/panelsandwich.org\/en\/contact\/\">Request quotation \u2192<\/a>\n    <a class=\"cta-secondary\" href=\"https:\/\/panelsandwich.org\/en\/types-of-sandwich-panels-which-to-choose-based-on-application\/\">View panel catalogue \u2192<\/a>\n  <\/div>\n<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>INSTALLATION SERVICE Sandwich panel assembly in Catalonia: roofs and facades Sandwich panel assembly service for new construction, refurbishment, roofs and facades. Installation is planned according to the geometry of the work, the type of panel, the supports, the fixings, the finishing touches and the necessary auxiliary means. We assemble in Catalonia and nearby provinces. Indicative [&hellip;]<\/p>\n","protected":false},"author":5963,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-43094","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/pages\/43094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/users\/5963"}],"replies":[{"embeddable":true,"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/comments?post=43094"}],"version-history":[{"count":4,"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/pages\/43094\/revisions"}],"predecessor-version":[{"id":81913,"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/pages\/43094\/revisions\/81913"}],"wp:attachment":[{"href":"https:\/\/panelsandwich.org\/en\/wp-json\/wp\/v2\/media?parent=43094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}