Replacing a uralite roof with sandwich panels: steps and regulations

Uralite roof

Yes, you can replace a uralite roof with sandwich panels, and it’s one of the most common roof refurbishments for industrial units, farms, and homes. The order is always the same. First, a company registered with RERA (Register of Companies with Asbestos Risk), with a work plan approved by the competent authorities, removes the sheets. Then the structure is checked and the new panel is installed.

And installing the sandwich panel over the uralite? Technically, it’s possible to encapsulate it, but the recommended option is to remove it completely to avoid future problems. Below you’ll find the reasons, the steps, the permits, and which panel to choose.

Why it’s worth replacing uralite

Uralite is fibre cement. It was widely used in past decades and today it’s an obsolete material. These are its issues:

  • Asbestos. It almost always contains asbestos, a carcinogenic fibrous mineral whose use has been prohibited in Spain since 2002. If the sheets have cracks or breaks, they can release particles into the air.
  • Almost no insulation. Transmite el frío y el calor al interior.
  • A lot of weight. Necesita una estructura de soporte importante.
  • Leaks. Con los años aparecen fisuras, filtraciones y humedades que se repiten.
  • Aged appearance. Afecta a la imagen y al valor del inmueble.

If your roof is old, treat it as if it could contain asbestos until a professional confirms it. You’ll find more detail in our article on the fibre-cement problem.

Fibre cement vs sandwich panels

Feature Uralite roof (fibre cement) Sandwich panel roof
Thermal insulation None or poor High, thanks to the insulating core
Weight on the structure Very high Lightweight, reduces the load
Watertightness Prone to cracks and leaks Watertight if properly fixed and finished
Health and safety Risk from breakage and fibres if it contains asbestos Asbestos-free
Aesthetics Aged Wide range of colours and finishes

Is it mandatory to remove uralite?

Today there is no general date that obliges an individual to remove it, but Waste Law 7/2022 obliges local councils to register facilities with asbestos and to set a removal schedule. It must be removed, or acted upon, when:

  • It’s deteriorated: it has damage, cracks, or breaks that can release particles.
  • It has reached the end of its service life.
  • You’re going to carry out work that affects it, such as replacing the roof.
  • It poses a health risk.

Requirements can vary by municipality, so check with your local council before deciding.

Who can remove uralite

Removing asbestos-containing sheets, known as asbestos removal, can only be done by a company registered with RERA, with workers trained and equipped in line with regulations. Before starting, the company must have its work plan approved by the competent authorities. It’s not a job you can do yourself.

This is what a proper removal looks like:

  1. Manual dismantling of the sheets, without breaking them or subjecting them to harsh friction.
  2. Airtight packaging of the removed material.
  3. Transport to an authorised landfill for hazardous waste.

Before hiring, ask the company for its RERA registration, the approved work plan, and how it will manage the waste.

Steps to replace a uralite roof with sandwich panels

  1. Initial assessment. Se revisa el estado de la cubierta, la superficie, los accesos y la estructura, y se decide qué panel conviene.
  2. Permits. You need a building permit or prior notification, depending on the municipality, and the approved asbestos work plan. Depending on the municipality and the work, they may ask for a technical project and process it as a major work.
  3. Removal of the uralite. La hace la empresa inscrita en el RERA, siguiendo su plan de trabajo.
  4. Structural inspection. The metal or concrete purlins and the timber beams are checked and repaired. If needed, they are levelled.
  5. Installation of the sandwich panel. Los paneles se fijan directamente sobre la estructura limpia y nivelada.
  6. Finishing details and final check. Se colocan los remates y se comprueba que todas las uniones queden estancas.

Because sandwich panels weigh much less than uralite, the existing structure usually works with minor levelling adjustments. Even so, always check it. Here we explain what structure you need before installing sandwich panels.

Can you install sandwich panels over uralite?

It’s one of the most common questions. Technically, you can encapsulate uralite with a new roof over the top, but it’s not recommended. The advisable option is to remove the old material completely. The reasons:

  • The asbestos remains inside the building. The problem doesn’t go away, it’s just postponed.
  • To fix the panel, you have to work on the old sheets. Drilling, cutting, or walking on them can break them and release fibres.
  • The structure would have to support the weight of the uralite plus the new panel.
  • You miss the chance to inspect and repair the structure.

If this solution is still proposed, have it assessed by a technician and carried out by a company registered with RERA, because it is also asbestos work.

Which panel to choose to replace uralite

  • Industrial units and warehouses: roof sandwich panel, ribbed or with cover flashing. It’s lightweight and insulates well.
  • Livestock farms and agricultural buildings: the Agropanel, our sandwich panel designed for livestock farms.
  • Homes and porches: the tile-effect panel, if you want a traditional roof look.

Before installing, check that your roof has the minimum pitch required by the chosen model. This is especially important for tile-effect panels.

Price and timelines

There’s no fixed price for replacing uralite with sandwich panels. The cost depends on:

  • The roof area.
  • The condition of the uralite and accessibility, which affect the asbestos removal.
  • The type and thickness of the panel.
  • The condition of the structure and any adjustments it needs.
  • Finishing details and accessories.

To get an idea of the installation part, see how much sandwich panel installation costs. For a real figure, request a quote with your measurements.

As for timelines, removal and installation on a medium-sized industrial unit are usually completed in a few days. As a reference, a specialised team can remove and install between 150 and 300 m² per day, depending on the job.

Sometimes there are regional or EU grants for energy refurbishment and the removal of obsolete materials like uralite. Check the current calls in your region before you start.

Frequently asked questions

Can I remove uralite myself?

No. Removing asbestos-containing sheets must be done by a company registered with RERA, with trained workers and an approved work plan.

What happens to the removed uralite?

It is sealed in airtight packaging and taken to an authorised landfill for hazardous waste.

Will the old structure work for the new panel?

In most cases, yes, because sandwich panels weigh much less and fit metal or concrete purlins. It must be checked and, sometimes, levelled or repaired.

Do I need permission from the local council?

Yes. You need a building permit or prior notification, depending on the municipality, and the approved asbestos work plan. Depending on the municipality, they may also ask for a technical project.

Do you handle removal and installation as a single job?

Yes. We coordinate the entire job: the fibre cement removal is carried out by a partner company registered with RERA, with its work plan approved, and then we install the new sandwich panels. That way, you have a single point of contact for the whole refurbishment.

Want to replace your uralite roof? Send us the measurements and a few photos of the roof and we’ll advise you on the most suitable panel. Request a no-obligation quote or call 699 147 762. We also handle sandwich panel installation.

PERSONALISED QUOTE

Receive a made-to-measure sandwich panel quote

Indicate dimensions, location, application and required service. The more data we have, the better we can adjust the panel, flashings, transport and installation.