973 228 164 · 699 147 762

Support Phone Number

Made to measure

Technical advice

Delivery to site

Specialist installation

SANDWICH PANEL · CONFIGURATION AND QUOTE

2012 – Front End Cap

Configure your panel

Select the available options. We will prepare the price based on dimensions, quantity, transport and installation.

PERSONALISED QUOTE

Request a price for this product

Tell us the panel type, area, thickness, location and whether you need supply only or installation. We’ll review the details to prepare a tailored proposal.

QUICK REQUEST

Tell us what you need

Complete the main details and we will prepare a proposal tailored to your project.

Description: 2012 – Front End Cap

The 2012 is a front end cap for trapezoidal and standing-seam roof sandwich panels. It closes the front of the panel at the eaves, the lowest part of the slope. It covers the edge where the insulation and the gaps between the ribs can be seen, and gives the edge of the roof a clean finish.

It is made in the same colours as the roof panel, so the flashing blends in with the roof.

Front end cap (ref. 2012): 3D view for roof sandwich panels
3D view of a die-cut front end cap for a 3-rib panel.

Characteristics

Reference2012
TypeFront end cap
Where it is usedFront of the panel at the eaves.
PanelTrapezoidal and standing-seam roof sandwich panels
MaterialPre-painted galvanised steel sheet
Thickness0.6 mm
ColourWhite RAL 9010, red RAL 3009, green RAL 6005, metallic grey RAL 9006, slate grey RAL 7024, blue RAL 5019 and cream RAL 1015
Piece length3 m
SoldBy the linear metre
AvailabilityThe most common colours are in stock; the rest are made to order.
FixingFlashing screws

How to install it

  1. Cut the eaves panels square so the front is straight.
  2. Offer the closure up to the front of the panel, starting at one corner of the eaves.
  3. Overlap the pieces by about 10 cm and seal the overlap with a bead of sealant or with butyl tape.
  4. Fix the closure to the top face of the panel with flashing screws every 30–50 cm.

Installation tips

  • Decide before fitting whether the eaves will have a gutter: that tells you how far the panel must overhang and where the closure goes.
  • The front closure also stops birds and insects nesting inside the ribs.
  • Cut the sheet with snips or a fine-tooth saw, never with an angle grinder: the sparks burn the paint and the sheet ends up rusting.

How many pieces do you need?

Measure the total length of the joint you need to cover, in metres. Each piece is 3 m long and overlaps the next one by about 10 cm, so it covers about 2.9 m. Divide the length by 2.9 and round up. For example, for 12 m you need 12 ÷ 2.9 = 4.1, that is, 5 pieces.

Made-to-measure flashings

If your project needs a different girth, another colour or a special fold, we make the flashing to measure. Send us a sketch with the dimensions and we will prepare a quote.

Frequently asked questions

Does the front closure replace the gutter?

No. The closure seals and protects the edge of the panel; the gutter collects the water from the roof. They are different pieces and many roofs have both.

Does it fit any panel thickness?

Tell us the thickness of your panel when you order and we will confirm whether the standard size fits or it needs to be made to measure.

See also all sandwich panel flashings. Need a price? Ask for a quote or call us on +34 699 147 762 · WhatsApp.

ON-SITE SERVICE

Specialist team for sandwich panel installation

We quote for new builds, refurbishment, roof and facade replacement, flashing installation, and work with sheet metal or skylights.

The quote depends on geometry, height, access, auxiliary equipment, location, fixings and junctions the job must resolve.

Sandwich panel installation on site