How to install rockwool sandwich panel: a step-by-step guide

rock wool panel for sectorization of warehouses

Rockwool sandwich panel is assembled almost the same way as polyurethane, with three differences: it weighs more, the core is more delicate when cutting and moving it, and to preserve its fire resistance (EI or REI), the system’s joints, fixings, and flashings must be respected. This guide is suitable for both facades and roofs.

What you need

  • Structure: purlins or studs aligned and at the calculated spacing. Guide: structure for sandwich panel.
  • Panel: roof, hidden-fix facade or visible-fix, or the acoustic version.
  • Fixing: self-drilling screws with washers of the appropriate length for the thickness.
  • Flashings and sealants suitable for the fire rating required by the project.
  • Tools: fine-toothed circular saw or jigsaw, screwdriver with torque limiter, suction cups, or flat slings.
  • Protection: gloves, goggles, and FFP2 mask when cutting (the wool releases dust and fibers).

Step by step

  1. Storage. Leave the bundles on blocks, on level ground, and under cover. Rockwool must not get wet before assembly.
  2. Handling. Levanta los paneles sin arrastrarlos, entre dos personas o con ventosas, y no los apoyes de canto: el núcleo se aplasta en las esquinas.
  3. Layout. Comprueba que la estructura está a plomo y alineada y marca la modulación de 1 m.
  4. First panel. En fachada, perfectamente aplomado; en cubierta, a escuadra y empezando por el lado contrario al viento dominante.
  5. Fixing. One screw with a washer at each support, in the number and position indicated by the manufacturer. Tighten with the torque limiter: if you over-tighten, the sheet metal will dent and the washer will stop sealing.
  6. Joints. Fit the male into the female without leaving any gaps. In hidden-fix facades, the screw remains inside the joint.
  7. Cuts and openings. Cut with a saw, never with an angle grinder. Clean away shavings and fill any gaps in the core with rockwool.
  8. Flashings and sealing. Install the flashings using flashing screws and seal the fire-rated joints with fire-tested products.

How to maintain fire resistance

The EI or REI rating belongs to the complete system tested (panel, joints, screws, and supports), not just the wool. To maintain it:

  • Use the same panel and thickness required by the project throughout the entire wall or roof.
  • Do not fill joints or gaps with polyurethane foam: use rockwool or fire-resistant sealants.
  • Seal pipe and cable penetrations with fire collars or fire seals.
  • Respect the manufacturer’s spacing between supports and fixings.

More on ratings in the rockwool sandwich panel guide: fire and acoustics.

Differences from polyurethane or PIR panels

Rockwool PUR / PIR
Fire A2-s1,d0, up to EI 240 B-s1,d0 to C-s3,d0
Noise Insulates and absorbs more Less
Thermal insulation Requires more thickness More with less thickness
Weight Higher Lower
Cutting Saw, with mask Saw
Storage Keep dry More tolerant

Frequently asked questions

Can it be cut with an angle grinder?

It is not recommended for any sandwich panel: the heat burns the paint near the cut and the sparks oxidize the sheet metal. Use a fine-toothed circular saw or a jigsaw.

What thickness do I need?

It depends on the fire resistance required by the project: in our panels, it ranges from EI 30 with 50 mm to EI 240 with 120 mm for facades, and from REI 30 to REI 180 for roofs.

Can any installer assemble it?

An installer with experience in sandwich panels, yes. If the project requires fire resistance certification, they should follow the system instructions to the letter and document joints and seals.

Does it need special maintenance?

No. The same as any panel roof or facade: sandwich panel maintenance.

Need a quote?

Tell us the surface area, thickness, or EI rating you need and where the project is located. Request a quote or call us at 699 147 762.

PERSONALISED QUOTE

Receive a made-to-measure sandwich panel quote

Indicate dimensions, location, application and required service. The more data we have, the better we can adjust the panel, flashings, transport and installation.